Building cleaning procedure

News

Building cleaning procedure

Cleaning determines the age of the building !

Building cleaning procedure

A shopping mall or newly constructed building (Post-Construction Cleaning) has the following cleaning sequence:

1. Initial Preparation (Preparation)

Preparing cleaning supplies and equipment

Wearing safety gear (gloves, mask, shoes)

Preparing an electrical and water condition survey

Preparing trash and containers

2. Removing dirt and debris (Rough Cleaning)

Dispose of or recycle construction waste (wood, cement, waste plastic)

Picking up large trash

Removing window and door covers from aluminum foil

3. Top to Bottom Cleaning

Ceiling cleaning – dust, stone

Cleaning lights, fans, AC vents

Cleaning walls and signs

4. Window and door cleaning

Window glass (inside & outside)

Cleaning frames, etc.

Doors, handles, etc.

5. Floor Cleaning

First sweep / vacuum

Scrubbing

The meaning of flooring varies depending on the type of floor:

Ceramic / Marble – polishing

Carpet – deep cleaning

6. Toilets & Washrooms

WC, basin, shower tray cleaning

Tap, mirror and so on

Using deodorant

7. Final / Detail Cleaning

Dust and re-clean touched areas

Removing paint and cement stains

Deodorizing

8. Final Inspection (Inspection & Handover)

Assess whether all rooms or areas are properly cleaned.

If there are any remaining areas, clean them again.

Prepare the building for use